Joint integrated production-maintenance policy with production plan smoothing through production rate control - Management de la Supply Chain Access content directly
Journal Articles Journal of Manufacturing Systems Year : 2017

Joint integrated production-maintenance policy with production plan smoothing through production rate control

Abstract

We consider a production system that has to satisfy a random demand during a finite planning horizon under a required service level. This study consists in developing an analytical model in order to determine a near-optimal integrated maintenance-production plan which takes into consideration the influence of the production rate on the system's failure rate while attempting in the same time to smooth the production plan through the production rate control between periods of the planning horizon. A numerical example is presented in order to illustrate the contribution of the proposed modelling approach and discuss the different trade-offs that are considered.
Fichier principal
Vignette du fichier
Dellagi et al paper - JMSY'17 (1).pdf (842.4 Ko) Télécharger le fichier
Origin : Files produced by the author(s)

Dates and versions

hal-01493305 , version 1 (21-03-2017)

Identifiers

Cite

Sofiene Dellagi, Anis Chelbi, Wajdi Trabelsi. Joint integrated production-maintenance policy with production plan smoothing through production rate control. Journal of Manufacturing Systems, 2017, 42, pp.262-270. ⟨10.1016/j.jmsy.2016.12.013⟩. ⟨hal-01493305⟩
203 View
337 Download

Altmetric

Share

Gmail Facebook X LinkedIn More